Test Strategy & Test Plan

Test Strategy
A Test Strategy document is a high level document and normally developed by project manager. This document defines “Testing Approach” to achieve testing objectives. The Test Strategy is normally derived from the Business Requirement Specification document.

The Test Stategy document is a static document meaning that it is not updated too often. It sets the standards for testing processes and activities and other documents such as the Test Plan draws its contents from those standards set in the Test Strategy Document.

Some companies include the “Test Approach” or “Strategy” inside the Test Plan, which is fine and it is usually the case for small projects. However, for larger projects, there is one Test Strategy document and different number of Test Plans for each phase or level of testing.

Components of the Test Strategy document

* Scope and Objectives
* Business issues
* Roles and responsibilities
* Communication and status reporting
* Test deliverability
* Industry standards to follow
* Test automation and tools
* Testing measurements and metrices
* Risks and mitigation
* Defect reporting and tracking
* Change and configuration management
* Training plan

Test Plan
The Test Plan document on the other hand, is derived from the Product Description, Software Requirement Specification SRS, or Use Case Documents.
The Test Plan document is usually prepared by the Test Lead or Test Manager and the focus of the document is to describe what to test, how to test, when to test and who will do what test.

It is not uncommon to have one Master Test Plan which is a common document for the test phases and each test phase have their own Test Plan documents.

There is much debate, as to whether the Test Plan document should also be a static document like the Test Strategy document mentioned above or should it be updated every often to reflect changes according to the direction of the project and activities.
My own personal view is that when a testing phase starts and the Test Manager is “controlling” the activities, the test plan should be updated to reflect any deviation from the original plan. After all, Planning and Control are continuous activities in the formal test process.

* Test Plan id
* Introduction
* Test items
* Features to be tested
* Features not to be tested
* Test techniques
* Testing tasks
* Suspension criteria
* Features pass or fail criteria
* Test environment (Entry criteria, Exit criteria)
* Test delivarables
* Staff and training needs
* Responsibilities
* Schedule

This is a standard approach to prepare test plan and test strategy documents, but things can vary company-to-compan

Thursday, December 23, 2010

TEST PLAN OUTLINE

(IEEE 829 FORMAT)
1) Test Plan Identifier
2) References
3) Introduction
4) Test Items
5) Software Risk Issues
6) Features to be Tested
7) Features not to be Tested
8) Approach
9) Item Pass/Fail Criteria
10) Suspension Criteria and Resumption Requirements
11) Test Deliverables
12) Remaining Test Tasks
13) Environmental Needs
14) Staffing and Training Needs
15) Responsibilities
16) Schedule
17) Planning Risks and Contingencies
18) Approvals
19) Glossary

1 TEST PLAN IDENTIFIER
Some type of unique company generated number to identify this test plan, its level and the
level of software that it is related to. Preferably the test plan level will be the same as the
related software level. The number may also identify whether the test plan is a Master plan, a
Level plan, an integration plan or whichever plan level it represents. This is to assist in
coordinating software and testware versions within configuration management.
Keep in mind that test plans are like other software documentation, they are dynamic in nature
and must be kept up to date. Therefore, they will have revision numbers.
You may want to include author and contact information including the revision history
information as part of either the identifier section of as part of the introduction.


2 REFERENCES
List all documents that support this test plan. Refer to the actual version/release number of
the document as stored in the configuration management system. Do not duplicate the text
from other documents as this will reduce the viability of this document and increase the
maintenance effort. Documents that can be referenced include:
• Project Plan
• Requirements specifications
• High Level design document
• Detail design document
• Development and Test process standards
• Methodology guidelines and examples
• Corporate standards and guidelines



3 INTRODUCTION
State the purpose of the Plan, possibly identifying the level of the plan (master etc.). This is
essentially the executive summary part of the plan.
You may want to include any references to other plans, documents or items that contain
information relevant to this project/process. If preferable, you can create a references section
to contain all reference documents.
Identify the Scope of the plan in relation to the Software Project plan that it relates to. Other
items may include, resource and budget constraints, scope of the testing effort, how testing
relates to other evaluation activities (Analysis & Reviews), and possible the process to be
used for change control and communication and coordination of key activities.
As this is the “Executive Summary” keep information brief and to the point.


4 TEST ITEMS (FUNCTIONS)
These are things you intend to test within the scope of this test plan. Essentially, something
you will test, a list of what is to be tested. This can be developed from the software
application inventories as well as other sources of documentation and information.
This can be controlled and defined by your local Configuration Management (CM) process if
you have one. This information includes version numbers, configuration requirements where
needed, (especially if multiple versions of the product are supported). It may also include key
delivery schedule issues for critical elements.
Remember, what you are testing is what you intend to deliver to the Client.
This section can be oriented to the level of the test plan. For higher levels it may be by
application or functional area, for lower levels it may be by program, unit, module or build.



5 SOFTWARE RISK ISSUES
Identify what software is to be tested and what the critical areas are, such as:
A. Delivery of a third party product.
B. New version of interfacing software
C. Ability to use and understand a new package/tool, etc.
D. Extremely complex functions
E. Modifications to components with a past history of failure
F. Poorly documented modules or change requests
There are some inherent software risks such as complexity; these need to be identified.
A. Safety
B. Multiple interfaces
C. Impacts on Client
D. Government regulations and rules
Another key area of risk is a misunderstanding of the original requirements. This can occur at
the management, user and developer levels. Be aware of vague or unclear requirements and
requirements that cannot be tested.
The past history of defects (bugs) discovered during Unit testing will help identify potential
areas within the software that are risky. If the unit testing discovered a large number of
defects or a tendency towards defects in a particular area of the software, this is an indication
of potential future problems. It is the nature of defects to cluster and clump together. If it
was defect ridden earlier, it will most likely continue to be defect prone.
One good approach to define where the risks are is to have several brainstorming sessions.
__Start with ideas, such as, what worries me about this project/application.


6 FEATURES TO BE TESTED
This is a listing of what is to be tested from the USERS viewpoint of what the system does.
This is not a technical description of the software, but a USERS view of the functions.
Set the level of risk for each feature. Use a simple rating scale such as (H, M, L): High,
Medium and Low. These types of levels are understandable to a User. You should be
prepared to discuss why a particular level was chosen.
It should be noted that Section 4 and Section 6 are very similar. The only true difference is the
point of view. Section 4 is a technical type description including version numbers and other
technical information and Section 6 is from the User’s viewpoint. Users do not understand
technical software terminology; they understand functions and processes as they relate to their
jobs.


7 FEATURES NOT TO BE TESTED
This is a listing of what is NOT to be tested from both the Users viewpoint of what the system
does and a configuration management/version control view. This is not a technical
description of the software, but a USERS view of the functions.
Identify WHY the feature is not to be tested, there can be any number of reasons.
• Not to be included in this release of the Software.
• Low risk, has been used before and is considered stable.
• Will be released but not tested or documented as a functional part of the release of this
version of the software.
Sections 6 and 7 are directly related to Sections 5 and 17. What will and will not be tested are
directly affected by the levels of acceptable risk within the project, and what does not get
tested affects the level of risk of the project.


8 APPROACH (STRATEGY)
This is your overall test strategy for this test plan; it should be appropriate to the level of the
plan (master, acceptance, etc.) and should be in agreement with all higher and lower levels of
plans. Overall rules and processes should be identified.
• Are any special tools to be used and what are they?
• Will the tool require special training?
• What metrics will be collected?
• Which level is each metric to be collected at?
• How is Configuration Management to be handled?
• How many different configurations will be tested?
• Hardware
• Software
• Combinations of HW, SW and other vendor packages
• What levels of regression testing will be done and how much at each test level?
• Will regression testing be based on severity of defects detected?
• How will elements in the requirements and design that do not make sense or are
untestable be processed?
If this is a master test plan the overall project testing approach and coverage requirements
must also be identified.
Specify if there are special requirements for the testing.
• Only the full component will be tested.
• A specified segment of grouping of features/components must be tested together.
Other information that may be useful in setting the approach are:
• MTBF, Mean Time Between Failures - if this is a valid measurement for the test involved
and if the data is available.
• SRE, Software Reliability Engineering - if this methodology is in use and if the
information is available.
How will meetings and other organizational processes be handled?




9 ITEM PASS/FAIL CRITERIA
What are the Completion criteria for this plan? This is a critical aspect of any test plan and
should be appropriate to the level of the plan.
• At the Unit test level this could be items such as:
• All test cases completed.
• A specified percentage of cases completed with a percentage containing some number
of minor defects.
• Code coverage tool indicates all code covered.
• At the Master test plan level this could be items such as:
• All lower level plans completed.
• A specified number of plans completed without errors and a percentage with minor
defects.
This could be an individual test case level criterion or a unit level plan or it can be general
functional requirements for higher level plans.

What is the number and severity of defects located?
• Is it possible to compare this to the total number of defects? This may be impossible, as
some defects are never detected.
• A defect is something that may cause a failure, and may be acceptable to leave in the
application.
• A failure is the result of a defect as seen by the User, the system crashes, etc.



10 SUSPENSION CRITERIA AND RESUMPTION REQUIREMENTS
Know when to pause in a series of tests.
If the number or type of defects reaches a point where the follow on testing has no value,
it makes no sense to continue the test; you are just wasting resources.
Specify what constitutes stoppage for a test or series of tests and what is the acceptable level
of defects that will allow the testing to proceed past the defects.
Testing after a truly fatal error will generate conditions that may be identified as defects but
are in fact ghost errors caused by the earlier defects that were ignored.



11 TEST DELIVERABLES
What is to be delivered as part of this plan?
__Test plan document.
__Test cases.
__Test design specifications.
__Tools and their outputs.
__Simulators.
__Static and dynamic generators.
__Error logs and execution logs.
__Problem reports and corrective actions.
One thing that is not a test deliverable is the software itself that is listed under test items and
is delivered by development.


12 REMAINING TEST TASKS
If this is a multi-phase process or if the application is to be released in increments there may
be parts of the application that this plan does not address. These areas need to be identified to
avoid any confusion should defects be reported back on those future functions. This will also
allow the users and testers to avoid incomplete functions and prevent waste of resources
chasing non-defects.
If the project is being developed as a multi-party process, this plan may only cover a portion
of the total functions/features. This status needs to be identified so that those other areas have
plans developed for them and to avoid wasting resources tracking defects that do not relate to
this plan.
When a third party is developing the software, this section may contain descriptions of those
test tasks belonging to both the internal groups and the external groups.



13 ENVIRONMENTAL NEEDS
Are there any special requirements for this test plan, such as:
• Special hardware such as simulators, static generators etc.
• How will test data be provided. Are there special collection requirements or specific
ranges of data that must be provided?
• How much testing will be done on each component of a multi-part feature?
• Special power requirements.
• Specific versions of other supporting software.
• Restricted use of the system during testing.



14 STAFFING AND TRAINING NEEDS
Training on the application/system.
Training for any test tools to be used.
What is to be tested and who is responsible for the testing and training.



15 RESPONSIBILITIES
Who is in charge?
This issue includes all areas of the plan. Here are some examples:
• Setting risks.
• Selecting features to be tested and not tested.
• Setting overall strategy for this level of plan.
• Ensuring all required elements are in place for testing.
• Providing for resolution of scheduling conflicts, especially, if testing is done on the
production system.
• Who provides the required training?
• Who makes the critical go/no go decisions for items not covered in the test plans?




16 SCHEDULE
Should be based on realistic and validated estimates. If the estimates for the development of
the application are inaccurate, the entire project plan will slip and the testing is part of the
overall project plan.
__As we all know, the first area of a project plan to get cut when it comes to crunch time at
the end of a project is the testing. It usually comes down to the decision, ‘Let’s put
something out even if it does not really work all that well’. And, as we all know, this is
usually the worst possible decision.
How slippage in the schedule will to be handled should also be addressed here.
__If the users know in advance that a slippage in the development will cause a slippage in
the test and the overall delivery of the system, they just may be a little more tolerant, if
they know it’s in their interest to get a better tested application.
__By spelling out the effects here you have a chance to discuss them in advance of their
actual occurrence. You may even get the users to agree to a few defects in advance, if the
schedule slips.
At this point, all relevant milestones should be identified with their relationship to the
development process identified. This will also help in identifying and tracking potential
slippage in the schedule caused by the test process.
It is always best to tie all test dates directly to their related development activity dates. This
prevents the test team from being perceived as the cause of a delay. For example, if system
testing is to begin after delivery of the final build, then system testing begins the day after
delivery. If the delivery is late, system testing starts from the day of delivery, not on a
specific date. This is called dependent or relative dating.



17 PLANNING RISKS AND CONTINGENCIES
What are the overall risks to the project with an emphasis on the testing process?
• Lack of personnel resources when testing is to begin.
• Lack of availability of required hardware, software, data or tools.
• Late delivery of the software, hardware or tools.
• Delays in training on the application and/or tools.
• Changes to the original requirements or designs.

Specify what will be done for various events, for example:
• Requirements definition will be complete by January 1, 19XX, and, if the requirements
change after that date, the following actions will be taken.
• The test schedule and development schedule will move out an appropriate number of
days. This rarely occurs, as most projects tend to have fixed delivery dates.
• The number of test performed will be reduced.
• The number of acceptable defects will be increased.
• These two items could lower the overall quality of the delivered product.
• Resources will be added to the test team.
• The test team will work overtime.
• This could affect team morale.
• The scope of the plan may be changed.
• There may be some optimization of resources. This should be avoided, if possible,
for obvious reasons.
• You could just QUIT.
A rather extreme option to say the least. Management is usually reluctant to accept scenarios such as the one above even though they have seen it happen in the past. The important thing to remember is that, if you do nothing at all, the usual result is that testing is cut back or omitted completely, neither of which should be an acceptable option.


18 APPROVALS
Who can approve the process as complete and allow the project to proceed to the next level
(Depending on the level of the plan)?
At the master test plan level, this may be all involved parties.
When determining the approval process, keep in mind who the audience is.
• The audience for a unit test level plan is different than that of an integration, system or
Master level plan.
• The levels and type of knowledge at the various levels will be different as well.
• Programmers are very technical but may not have a clear understanding of the overall
Business process driving the project.
• Users may have varying levels of business acumen and very little technical skills.
• Always be wary of users who claim high levels of technical skills and programmers that
claim to fully understand the business process. These types of individuals can cause more
harm than good if they do not have the skills they believe they possess.


19 GLOSSARY
Used to define terms and acronyms used in the document, and testing in general, to eliminate
confusion and promote consistent communications.

What are the different test plan documents in project?

The test plan documents that are prepared during a project are
Centre Test plan
Project Test plan
Unit Test plan
System Test plan
Integration Test plan
Acceptances Test plan

Central/Project test plan: This is the main test plan which outlines the
complete test strategy of the software project. This document should be
prepared before the start of the project and is used until the end of the
software development lifecyle.


Acceptance test plan: This test plan is normally prepared with the end
customer. This document commences during the requirement phase and is
completed at final delivery.


System test plan: This test plan starts during the design phase and proceeds
until the end of the project.


Integration and unit test plan: Both of these test plans start during the
execution phase and continue until the final delivery.

Tuesday, December 21, 2010

What is Test Plan?

What's a 'test plan'?
A software project test plan is a document that describes the objectives, scope, approach, and focus of a software testing effort. The process of preparing a test plan is a useful way to think through the efforts needed to validate the acceptability of a software product. The completed document will help people outside the test group understand the 'why' and 'how' of product validation. It should be thorough enough to be useful but not so thorough that no one outside the test group will read it. The following are some of the items that might be included in a test plan, depending on the particular project:
  • Title
  • Identification of software including version/release numbers
  • Revision history of document including authors, dates, approvals
  • Table of Contents
  • Purpose of document, intended audience
  • Objective of testing effort
  • Software product overview
  • Relevant related document list, such as requirements, design documents, other test plans, etc.
  • Relevant standards or legal requirements
  • Traceability requirements
  • Relevant naming conventions and identifier conventions
  • Overall software project organization and personnel/contact-info/responsibilties
  • Test organization and personnel/contact-info/responsibilities
  • Assumptions and dependencies
  • Project risk analysis
  • Testing priorities and focus
  • Scope and limitations of testing
  • Test outline - a decomposition of the test approach by test type, feature, functionality, process, system, module, etc. as applicable
  • Outline of data input equivalence classes, boundary value analysis, error classes
  • Test environment - hardware, operating systems, other required software, data configurations, interfaces to other systems
  • Test environment validity analysis - differences between the test and production systems and their impact on test validity.
  • Test environment setup and configuration issues
  • Software migration processes
  • Software CM processes
  • Test data setup requirements
  • Database setup requirements
  • Outline of system-logging/error-logging/other capabilities, and tools such as screen capture software, that will be used to help describe and report bugs
  • Discussion of any specialized software or hardware tools that will be used by testers to help track the cause or source of bugs
  • Test automation - justification and overview
  • Test tools to be used, including versions, patches, etc.
  • Test script/test code maintenance processes and version control
  • Problem tracking and resolution - tools and processes
  • Project test metrics to be used
  • Reporting requirements and testing deliverables
  • Software entrance and exit criteria
  • Initial sanity testing period and criteria
  • Test suspension and restart criteria
  • Personnel allocation
  • Personnel pre-training needs
  • Test site/location
  • Outside test organizations to be utilized and their purpose, responsibilities, deliverables, contact persons, and coordination issues
  • Relevant proprietary, classified, security, and licensing issues.
  • Open issues